Sign In | Join Free | My fazendomedia.com
China Changsha Potency Mechanical Technology Co., Ltd. logo
Changsha Potency Mechanical Technology Co., Ltd.
Dare to think and dare to do !
Verified Supplier

1 Years

Home > Arch Installation Trolley >

13KW Rock Drill Power Arch Installation Cart For 33mm - 64mm Drilling

Changsha Potency Mechanical Technology Co., Ltd.
Trust Seal
Verified Supplier
Credit Check
Supplier Assessment
Contact Now

13KW Rock Drill Power Arch Installation Cart For 33mm - 64mm Drilling

  • 1
  • 2

Brand Name : POTENTIAL / POTENCY

Model Number : KGZ9300

Place of Origin : CHINA

Certification : ISO9001:2015

MOQ : 1 Unit

Price : Negotiable

Packaging Details : FR or Bulk Ship

Delivery Time : 45 working days

Payment Terms : T/T, L/C

Supply Ability : 120 units per year

Max.Operating Height : 13m

Transportation Dimension (L X W X H) : 9200×2800×3650mm

Rock Drill Power : 13Kw

Platform Load Capacity : 3000Kg

Gradeability : 22 Degree

Drilling Diameter Of Rock Drill : Φ33~Φ64mm

Max.Operating Width : 15m

Model : Arch Installation Trolley KGZ9300 With Rock Drill

Contact Now

13Kw Rock Drill Power Arch Installation Cart KGZ9300 for Φ33~Φ64mm Drilling Diameter Rock Drilling

Product Description:

In the present tunnel construction process, it is observed that the mechanization of arch installation has become a trend. However, there are certain products available in the market that are either ineffective or can only provide mechanization without improving work efficiency and reducing construction personnel. Such products do not hold true practical value.

Potential/Potency has developed a unique product that combines their already produced multi arch support manipulator and multifunctional rock drilling machine. By doing so, they have created a product that not only meets the requirement of improving work efficiency and reducing personnel but also has the ability of the entire process of tunnel arch erection operation. This product has currently applied for multiple invention patents.

Features:

Chassis and Steering

The equipment is designed with an engineering chassis which allows for four-wheel drive and provides strong climbing abilities. Additionally, it is designed with four-wheel steering that has a small turning radius.

Dual Power System

Our equipment has adopted a dual power system consisting of both diesel and electric. The diesel is used to complete walking while the electric independently completes arch support.

Working Arm Frame

The equipment is equipped with a three working arm frame which has a folding+telescopic structure. The upper arm, middle arm and lower arm are combined to provide maximum flexibility. The middle arm is extendable and the transportation status can be folded and returned to the frame as a whole.

Dual Work Platform and Hydraulic Mechanism

The equipment also has a dual work platform with an arch dragging and clamping device along with a crane function on the left arm for vehicle accompaniment. Additionally, a dual hydraulic rock drilling mechanism is capable of providing drilling support for locking feet, advance and system anchor rods.

Multi Arch Device and Comfortable Cab

The main arm has a self transporting and forming multi arch device. Our equipment is also equipped with an air-conditioned cab for operator comfort and a reversing camera for added safety.

Control and Monitoring System

The equipment is controller controlled with a large screen display of parameters allowing for real-time monitoring of system operation status. The arm frame control intelligent assistance system can achieve rapid positioning of the arch frame and improve efficiency.

Note: HTML tags have been added for improved readability.

Technical Parameters:

Product Specifications

Below are the technical details for our product:

1. Maximum Load of The Main Arm

The maximum load of the main arm is 3000 kg.

2. Scope of Application of Steel Arches

The scope of application for steel arches is between I12 and I25a.

3. Rock Drill Power

The rock drill has a power of 13 kW.

4. Drilling Diameter of Rock Drill

The drilling diameter of the rock drill is between Φ33 and Φ64 mm.

5. Drilling Depth of Rock Drill (Single Rod)

The drilling depth of the rock drill with a single rod is 4.5 m.

6. Drilling Speed of Rock Drill

The drilling speed of the rock drill is between 1 and 1.5 m/min.

7. The Walking Speed

The walking speed is as follows:

  • Low Speed Gear: 0-8 km/h
  • High Speed Gear: 8-18 km/h
8. Minimum Turning Radius

The minimum turning radius is as follows:

  • Inner: ≤3m
  • Outer: ≤6m
9. Gradeability

The gradeability is 22°.

10. Maximum Load of Aerial Work Platform

The maximum load of the aerial work platform is 400 kg.

11. Maximum Working Height

The maximum working height is 13 m.

12. Maximum Working Width

The maximum working width is 15 m.

13. Dimensions in Transport State (Length x Width x Height)

The dimensions of the product in transport state are:

  • Length: 99200 mm
  • Width: 2800 mm (3526 mm with arms extended)
  • Height: 3650 mm
14. Weight

The weight of the product is 35000 kg.

13KW Rock Drill Power Arch Installation Cart For 33mm - 64mm Drilling

Applications:

Steel Frame Installation

The arch frame installation trolley is used for the installation of steel frames inside the tunnel. The steel frame serves as the skeleton of the tunnel structure, ensuring its stability and safety. By utilizing the installation trolley, the steel frame can be precisely positioned and promptly installed, which enhances work efficiency and installation accuracy.

Mesh Installation

In addition to the steel frame, the arch installation trolley can also be used to install mesh. Mesh is a part of the tunnel lining that disperses and absorbs geostress, preventing rock loosening and collapse. The installation trolley can transport and fix the mesh, allowing it to be promptly and precisely installed in place.

Installation of Connecting Bars

Connecting bars are crucial components that connect steel frames and mesh sheets, ensuring the integrity and stability of the entire supporting structure. The arch installation trolley can aid in the installation of connecting bars, ensuring that each connection point is secure and dependable.

Auxiliary Inspection and Risk Mitigation

Safety inspection and risk mitigation are vital during tunnel construction. The arch installation trolley is equipped with various equipment and tools, helping construction personnel conduct safety inspections and risk mitigation, promptly detect and resolve potential hazards, and ensure the safety of the construction.

Underexcavation Handling

Underexcavation can occur during tunnel excavation. The arch installation trolley can aid in underexcavation handling to ensure that the cross-sectional dimensions of the tunnel meet design requirements.

Explosive Installation

Explosive installation is a critical step in blasting operations during tunnel construction. The arch installation trolley is equipped with safety protection devices and operating platforms to assist construction personnel in safe and accurate explosive installation, ensuring the safety and effectiveness of the blasting operation.

Anchor Rod Installation

Anchor rods are vital components of tunnel support that fix surrounding rock and prevent collapse. The arch installation trolley can transport anchor rods and installation equipment, aiding the construction personnel in installing anchor rods, improving construction efficiency and safety.


Product Tags:

13KW Arch Installation Cart

      

64mm Arch Installation Cart

      
Best 13KW Rock Drill Power Arch Installation Cart For 33mm - 64mm Drilling wholesale

13KW Rock Drill Power Arch Installation Cart For 33mm - 64mm Drilling Images

Inquiry Cart 0
Send your message to this supplier
 
*From:
*To: Changsha Potency Mechanical Technology Co., Ltd.
*Subject:
*Message:
Characters Remaining: (0/3000)